Tap for scheduled closures

open

Planned closure tonight!

between Göschenen and Airolo in both directions tunnel closed, abnormal load, from today 11:00 PM until tomorrow 1:00 AM

North Portal

20 min

Waiting time

2 km

Queue length

Tap to zoom

all on-ramps open

South Portal

20 min

Waiting time

2 km

Queue length

Tap to zoom

all on-ramps open

Preferential lane CUPRA Closed

Tap for more information

Provided by viasuisse-logo

Airolo, Lüina closed, road construction, until 10/3/2025 7:00 PM

Start

05.05.2025 08:00:00

End

03.10.2025 19:00:00

Last update: 06.06.2025 08:38:06

A2 - Luzern to Gotthard

between Wassen and Göschenen stopped traffic for 2 km, traffic congestion, delays up to 20 minutes

Start

End

Last update: 18.06.2025 13:44:06

A2 - Chiasso to Gotthard

between Quinto and Airolo stopped traffic for 2 km, traffic congestion, delays up to 20 minutes

Start

End

Last update: 18.06.2025 12:40:56

A2 - Gotthard to Luzern

between Amsteg and Motorway intersection Altdorf traffic problem for 0.1 km, road construction during the day time, narrow lanes, roadway reduced to one lane, temporary roadway width limit of 4 m, from 6/26/2025 until 6/27/2025, between 8:00 AM and 4:00 PM

Start

26.06.2025 08:00:00

End

27.06.2025 16:00:00

Last update: 16.06.2025 11:48:11

Airolo, Lüina closed, road construction, until 10/3/2025 7:00 PM

Start

05.05.2025 08:00:00

End

03.10.2025 19:00:00

Last update: 06.06.2025 08:38:06

A2 - Chiasso to Gotthard

Gotthard-Tunnel traffic problem, road construction for 0.3 km, new road layout, temporary roadway width limit of 5.65 m, until 12/29/2028 5:00 AM

Start

20.04.2022 05:00:00

End

29.12.2028 05:00:00

Last update: 18.09.2022 20:45:36

A2 - Gotthard to Chiasso

between Quinto and Faido traffic problem, road construction for 1.4 km, new road layout, temporary roadway width limit of 6.80 m, until 7/16/2025 5:00 PM

Start

05.02.2025 05:00:00

End

16.07.2025 17:00:00

Last update: 25.02.2025 10:11:18

A2 - Luzern to Gotthard

between rest area Gurtnellen and Naxberg-Tunnel traffic problem, road construction during the day time for 1.3 km, roadway reduced to one lane, temporary roadway width limit of 3.50 m, on Tuesday from 7:00 AM until 5:00 PM

Start

24.06.2025 07:00:00

End

24.06.2025 17:00:00

Last update: 18.06.2025 15:32:33

A2 - Chiasso - Gotthard

between Biasca and Quinto in both directions traffic problem, road construction for 25 km, roadway reduced to one lane, temporary roadway width limit of 6.30 m, from 10/6/2025 until 10/17/2025, Mon - Fri between 6:00 AM and 3:00 PM

Start

06.10.2025 06:00:00

End

17.10.2025 15:00:00

Last update: 05.06.2025 14:18:13

A2 - Gotthard to Chiasso

between rest area Dosage area Airolo and Airolo traffic problem, road construction for 0.1 km, road construction on the shoulder, until 6/28/2028 8:00 AM

Start

19.11.2024 08:00:00

End

28.06.2028 08:00:00

Last update: 14.11.2024 16:26:03

A2 - Chiasso - Gotthard

between Biasca and Airolo in both directions traffic problem, road construction for 35 km, shoulder closed, from 8/4/2025 until 8/29/2025, Mon - Fri between 5:00 AM and 2:00 PM

Start

04.08.2025 05:00:00

End

29.08.2025 14:00:00

Last update: 05.06.2025 14:41:27

A2 - Chiasso to Gotthard

between Faido and Quinto traffic problem, road construction for 1.4 km, temporary roadway width limit of 7.15 m, until 7/16/2025 5:00 PM - ID96503

Start

05.02.2025 05:00:00

End

16.07.2025 17:00:00

Last update: 25.02.2025 10:09:49

H2 - Main road, Göschenen to Airolo

between Gotthard-Pass and Motto Bartola traffic problem, road construction, temporary roadway width limit of 3.50 m, until 7/4/2025 5:00 PM

Start

16.05.2025 07:00:00

End

04.07.2025 17:00:00

Last update: 06.06.2025 16:57:22

A2 - Chiasso - Gotthard

between Biasca and Quinto in both directions traffic problem, road construction for 25 km, narrow lanes, roadway reduced to one lane, temporary roadway width limit of 6.30 m, from 7/7/2025 until 7/25/2025, Mon - Fri between 5:00 AM and 2:00 PM - ID99567

Start

07.07.2025 05:00:00

End

25.07.2025 14:00:00

Last update: 05.06.2025 14:19:04

A2 - Luzern to Gotthard

between rest area Gurtnellen and Naxberg-Tunnel traffic problem for 1.3 km, road construction during the day time, narrow lanes, roadway reduced to one lane, temporary roadway width limit of 3.50 m, on 6/25/2025 from 7:00 AM until 5:00 PM

Start

25.06.2025 07:00:00

End

25.06.2025 17:00:00

Last update: 18.06.2025 15:32:30

A2 - Gotthard - Chiasso

Gotthard-Tunnel in both directions traffic problem, road construction for 0.3 km, temporary roadway width limit of 5.20 m, until 12/29/2028 5:00 AM

Start

25.06.2021 05:00:00

End

29.12.2028 05:00:00

Last update: 16.05.2023 17:34:07

H2 - Main road, Göschenen - Airolo

between Andermatt and Hospental in both directions traffic problem, road construction for 0.5 km, temporary roadway width limit of 4 m, temporary gross weight limit of 44 t, until 12/31/2025 5:00 PM

Start

22.10.2024 12:00:00

End

31.12.2025 17:00:00

Last update: 23.10.2024 07:36:41

A2 - Luzern - Chiasso

between Göschenen and Airolo in both directions tunnel closed, abnormal load, from today 11:00 PM until tomorrow 1:00 AM

Start

18.06.2025 23:00:00

End

19.06.2025 01:00:00

Last update: 18.06.2025 06:35:50

H2 - Main road, Göschenen - Airolo

between Gotthard-Pass and Motto Bartola in both directions traffic problem, road construction for 0.3 km, temporary traffic lights, temporary roadway width limit of 4 m, until 8/15/2025, Mon - Fri between 7:00 AM and 8:00 PM

Start

16.05.2025 07:00:00

End

15.08.2025 20:00:00

Last update: 20.05.2025 11:29:03

H2 - Main road, Göschenen - Airolo

between Hospental and Motto Bartola in both directions traffic problem, road construction for 26.4 km, sports event, on 7/20/2025 from 9:30 AM until 12:00 PM

Start

20.07.2025 09:30:00

End

20.07.2025 12:00:00

Last update: 04.03.2025 12:33:01

H2 - Main road, Göschenen - Airolo

between Gotthard-Pass and Motto Bartola in both directions traffic problem, road construction for 0.4 km, temporary traffic lights, temporary roadway width limit of 3.30 m, until 9/30/2025, Mon - Fri between 7:00 AM and 8:00 PM

Start

16.05.2025 07:00:00

End

30.09.2025 20:00:00

Last update: 15.06.2025 15:13:53

A2 - Gotthard to Chiasso

between Airolo and Quinto closed, road construction during the night, follow local detour, from 6/26/2025 10:00 PM until 6/27/2025 5:00 AM

Start

26.06.2025 22:00:00

End

27.06.2025 05:00:00

Last update: 06.06.2025 16:38:46

A2 - Chiasso to Gotthard

between Giornico and Faido closed, road construction during the night, follow local detour, from 6/25/2025 10:00 PM until 6/26/2025 5:00 AM

Start

25.06.2025 22:00:00

End

26.06.2025 05:00:00

Last update: 06.06.2025 16:29:55

A2 - Gotthard - Chiasso

Gotthard-Tunnel in both directions tunnel closed (length: 17 km), road construction during the night for 17 km, follow local detour, from Monday until 6/27/2025, between 8:00 PM and 5:00 AM

Start

23.06.2025 20:00:00

End

27.06.2025 05:00:00

Last update: 24.04.2025 11:01:31

A2 - Chiasso to Gotthard

between Quinto and Airolo closed, road construction during the night, lane closed, follow local detour, from 6/25/2025 10:00 PM until 6/26/2025 5:00 AM

Start

25.06.2025 22:00:00

End

26.06.2025 05:00:00

Last update: 06.06.2025 16:59:32

A2 - Chiasso to Gotthard

between Quinto and Airolo closed, road construction during the night, follow local detour, from Monday 10:00 PM until Tuesday 5:00 AM

Start

23.06.2025 22:00:00

End

24.06.2025 05:00:00

Last update: 06.06.2025 16:40:10

A2 - Luzern to Gotthard

between Wassen and Göschenen closed during the night for 3.5 km, road construction during the night for 3.5 km, from Monday 8:00 PM until Tuesday 5:00 AM

Start

23.06.2025 20:00:00

End

24.06.2025 05:00:00

Last update: 18.06.2025 16:25:13

A2 - Gotthard to Chiasso

between Quinto and Faido traffic problem for 0.2 km, road construction during the night, narrow lanes, roadway reduced to one lane, temporary roadway width limit of 6.50 m, from 7/7/2025 until 7/11/2025, between 8:00 PM and 5:00 AM

Start

07.07.2025 20:00:00

End

11.07.2025 05:00:00

Last update: 13.06.2025 08:57:20

A2 - Chiasso to Gotthard

between Giornico and Faido closed, road construction during the night, follow local detour, from Monday 10:00 PM until Tuesday 5:00 AM

Start

23.06.2025 22:00:00

End

24.06.2025 05:00:00

Last update: 06.06.2025 16:31:42

A2 - Gotthard to Chiasso

between Airolo and Quinto closed, road construction during the night for 9.0 km, follow local detour, from 6/24/2025 10:00 PM until 6/25/2025 5:00 AM

Start

24.06.2025 22:00:00

End

25.06.2025 05:00:00

Last update: 06.06.2025 16:37:50

Lukmanier: Biasca - Disentis/Mustér

Lukmanier open for all vehicles

Start

None

End

None

Last update: 15.06.2025 16:07:49

Gotthard: Göschenen - Airolo

Gotthard open for all vehicles

Start

None

End

None

Last update: 18.05.2025 13:04:28

Oberalp: Disentis - Andermatt

Oberalp open for all vehicles

Start

None

End

None

Last update: 23.05.2025 15:54:30