Airolo, Lüina closed, road construction, until 10/3/2025 7:00 PM
Start
05.05.2025 08:00:00
End
03.10.2025 19:00:00
Last update: 05.05.2025 10:51:37
Airolo, Tremola closed, winter closure
Start
End
Last update: 08.05.2025 14:15:39
A2 - Chiasso to Gotthard
between Biasca and Quinto traffic problem, road construction during the day time for 18 km, new road layout, temporary roadway width limit of 9.90 m, until Friday, between 7:00 AM and 4:00 PM
Start
12.05.2025 07:00:00
End
16.05.2025 16:00:00
Last update: 10.04.2025 15:19:57
A2 - Chiasso to Gotthard
between Quinto and Airolo traffic problem, road construction during the day time for 2.9 km, shoulder closed, temporary roadway width limit of 7.75 m, on 5/20/2025 from 8:30 AM until 6:00 PM
Start
20.05.2025 08:30:00
End
20.05.2025 18:00:00
Last update: 08.05.2025 15:09:33
A2 - Chiasso to Gotthard
Gotthard-Tunnel traffic problem, road construction for 0.3 km, new road layout, temporary roadway width limit of 5.65 m, until 12/29/2028 5:00 AM
Start
20.04.2022 05:00:00
End
29.12.2028 05:00:00
Last update: 18.09.2022 20:45:36
A2 - Gotthard - Chiasso
Gotthard-Tunnel in both directions traffic problem, road construction for 0.3 km, temporary roadway width limit of 5.20 m, until 12/29/2028 5:00 AM
Start
25.06.2021 05:00:00
End
29.12.2028 05:00:00
Last update: 16.05.2023 17:34:07
A2 - Gotthard to Chiasso
between rest area Dosage area Airolo and Airolo traffic problem, road construction for 0.1 km, road construction on the shoulder, until 6/28/2028 8:00 AM
Start
19.11.2024 08:00:00
End
28.06.2028 08:00:00
Last update: 14.11.2024 16:26:03
A2 - Luzern - Gotthard
at Motorway intersection Altdorf in both directions traffic problem, road construction during the day time for 0.5 km, new road layout, roadway reduced to one lane, temporary roadway width limit of 3.50 m, on Monday from 8:00 AM until 4:00 PM
Start
19.05.2025 08:00:00
End
19.05.2025 16:00:00
Last update: 05.05.2025 10:35:20
A2 - Chiasso to Gotthard
between Faido and Quinto traffic problem, road construction for 1.4 km, temporary roadway width limit of 7.15 m, until 7/16/2025 5:00 PM - ID96503
Start
05.02.2025 05:00:00
End
16.07.2025 17:00:00
Last update: 25.02.2025 10:09:49
A2 - Chiasso - Gotthard
between Biasca and Airolo in both directions traffic problem for 35 km, road construction during the day time, shoulder closed, from Monday until 6/6/2025, Mon - Fri between 5:00 AM and 2:00 PM
Start
19.05.2025 05:00:00
End
06.06.2025 14:00:00
Last update: 10.04.2025 14:34:44
A2 - Gotthard to Chiasso
between Quinto and Faido traffic problem, road construction for 1.4 km, new road layout, temporary roadway width limit of 6.80 m, until 7/16/2025 5:00 PM
Start
05.02.2025 05:00:00
End
16.07.2025 17:00:00
Last update: 25.02.2025 10:11:18
Airolo, Lüina closed, road construction, until 10/3/2025 7:00 PM
Start
05.05.2025 08:00:00
End
03.10.2025 19:00:00
Last update: 05.05.2025 10:51:37
H2 - Main road, Göschenen - Airolo
between Andermatt and Hospental in both directions traffic problem, road construction for 0.5 km, temporary roadway width limit of 3 m, until 6/13/2025 5:00 PM
Start
12.05.2025 08:00:00
End
13.06.2025 17:00:00
Last update: 12.12.2024 15:10:04
A2 - Luzern - Gotthard
between Wassen and Naxberg-Tunnel in both directions traffic problem, road construction during the day time for 1.1 km, new road layout, roadway reduced to one lane, temporary roadway width limit of 3.50 m, from 5/20/2025 7:00 AM until 5/21/2025 4:00 PM
Start
20.05.2025 07:00:00
End
21.05.2025 16:00:00
Last update: 15.04.2025 16:31:29
A2 - Luzern - Gotthard
between Motorway intersection Altdorf and Amsteg in both directions traffic problem, road construction during the day time for 0.1 km, set of slow moving maintenance vehicles, narrow lanes, roadway reduced to one lane, temporary roadway width limit of 4 m, from 5/20/2025 until 5/23/2025, between 8:00 AM and 4:00 PM
Start
20.05.2025 08:00:00
End
23.05.2025 16:00:00
Last update: 05.05.2025 12:36:55
H2 - Main road, Göschenen - Airolo
between Hospental and Motto Bartola in both directions traffic problem, road construction for 26.4 km, sports event, on 7/20/2025 from 9:30 AM until 12:00 PM
Start
20.07.2025 09:30:00
End
20.07.2025 12:00:00
Last update: 04.03.2025 12:33:01
H2 - Main road, Göschenen - Airolo
between Andermatt and Hospental in both directions traffic problem, road construction for 0.5 km, temporary roadway width limit of 4 m, temporary gross weight limit of 44 t, until 12/31/2025 5:00 PM
Start
22.10.2024 12:00:00
End
31.12.2025 17:00:00
Last update: 23.10.2024 07:36:41
H2 - Main road, Göschenen - Airolo
at Hospental in both directions traffic problem, road construction for 0.2 km, single line traffic-alternating directions, temporary roadway width limit of 4 m, until tomorrow 5:00 PM
Start
05.05.2025 07:00:00
End
14.05.2025 17:00:00
Last update: 29.04.2025 10:22:10
H2 - Main road, Flüelen - Airolo
between A2, Göschenen and Andermatt in both directions closed, road construction during the night, follow local detour, from tomorrow 9:00 PM until Thursday 5:00 AM - ID98896
Start
14.05.2025 21:00:00
End
15.05.2025 05:00:00
Last update: 09.05.2025 10:00:23
A2 - Gotthard to Luzern
between Göschenen and Amsteg closed, road construction during the night, follow local detour, from today 10:00 PM until tomorrow 5:00 AM
Start
13.05.2025 22:00:00
End
14.05.2025 05:00:00
Last update: 06.05.2025 11:05:29
A2 - Luzern to Gotthard
between Amsteg and Wassen closed, road construction during the night, from 5/19/2025 until 5/20/2025, between 10:00 PM and 5:00 AM
Start
19.05.2025 22:00:00
End
20.05.2025 05:00:00
Last update: 12.05.2025 11:11:23
A2 - Gotthard - Chiasso
Gotthard-Tunnel in both directions tunnel closed, road construction during the night for 17 km, follow local detour, from 6/16/2025 until 6/18/2025, between 8:00 PM and 5:00 AM
Start
16.06.2025 20:00:00
End
18.06.2025 05:00:00
Last update: 24.04.2025 11:00:43
A2 - Gotthard to Luzern
between Wassen and Amsteg closed, road construction during the night for 10 km, follow local detour, from 5/20/2025 10:00 PM until 5/21/2025 5:00 AM
Start
20.05.2025 22:00:00
End
21.05.2025 05:00:00
Last update: 31.03.2025 06:29:19
A2 - Gotthard - Chiasso
Gotthard-Tunnel in both directions tunnel closed, road construction during the night, detour in operation, from 6/2/2025 until 6/6/2025, between 8:00 PM and 5:00 AM
Start
02.06.2025 20:00:00
End
06.06.2025 05:00:00
Last update: 24.04.2025 11:06:15
A2 - Gotthard - Chiasso
Gotthard-Tunnel in both directions tunnel closed, road construction during the night for 17 km, follow local detour, from 6/10/2025 until 6/12/2025, Tue - Thu between 8:00 PM and 5:00 AM
Start
10.06.2025 20:00:00
End
12.06.2025 05:00:00
Last update: 24.04.2025 11:00:31
A2 - Gotthard to Luzern
between Göschenen and Wassen closed, road construction during the night, follow local detour, from tomorrow 10:00 PM until Thursday 5:00 AM
Start
14.05.2025 22:00:00
End
15.05.2025 05:00:00
Last update: 07.05.2025 11:02:16
A2 - Gotthard - Chiasso
Gotthard-Tunnel in both directions tunnel closed (length: 17 km), road construction during the night for 17 km, follow local detour, from 6/23/2025 until 6/27/2025, between 8:00 PM and 5:00 AM
Start
23.06.2025 20:00:00
End
27.06.2025 05:00:00
Last update: 24.04.2025 11:01:31
A2 - Luzern to Gotthard
between Wassen and Göschenen closed, road construction during the night, follow local detour, from Thursday 10:00 PM until Friday 5:00 AM
Start
15.05.2025 22:00:00
End
16.05.2025 05:00:00
Last update: 12.05.2025 15:17:18
A2 - Chiasso to Gotthard
between Biasca and Quinto traffic problem, road construction during the night for 9.7 km, new road layout, temporary roadway width limit of 3.30 m, until Friday, between 9:00 PM and 5:00 AM - ID98312
Start
12.05.2025 21:00:00
End
16.05.2025 05:00:00
Last update: 18.04.2025 11:58:52
A2 - Gotthard to Chiasso
between Airolo and Quinto traffic problem for 0.4 km, road construction during the night, narrow lanes, roadway reduced to one lane, temporary roadway width limit of 3.50 m, from 6/12/2025 9:00 PM until 6/13/2025 4:30 AM
Start
12.06.2025 21:00:00
End
13.06.2025 04:30:00
Last update: 02.05.2025 11:57:23
Gotthard: Göschenen - Airolo
Gotthard winter closure for all vehicles until 5/16/2025 11:00 AM
Start
None
End
None
Last update: 13.05.2025 13:16:12
Lukmanier: Biasca - Disentis/Mustér
Lukmanier open for all vehicles
Start
None
End
None
Last update: 10.05.2025 12:13:32
Oberalp: Disentis - Andermatt
Oberalp open for all vehicles
Start
None
End
None
Last update: 10.05.2025 12:13:11
Gotthard Traffic
Discover the new functionalities!
New graphical interface and new data provider!
Google Play App
Download our app now!
Download our app from the Google Play Store. It's free!
The Gotthard pass is usually closed during the winter period, from November to May, and it is open during the summer period, from May to November.
Currently, the San Gottardo Pass is closed for the winter.
Gotthard Tunnel Closures
The Gotthard tunnel is normally closed either from Wednesday evening at 23:00 to Thursday morning at 01:00 or from Thursday evening at 23:00 to Friday morning at 01:00 for special transports.
List of planned night closures in 2025:
31 March - 4 Aprilfrom Monday evening to Friday morning
22:00 - 5:00
7 - 9 Aprilfrom Monday evening to Wednesday morning
22:00 - 5:00
2 - 6 Junefrom Monday evening to Friday morning
20:00 - 5:00
10 - 12 Junefrom Tuesday evening to Thursday morning
20:00 - 5:00
16 - 18 Junefrom Monday evening to Wednesday morning
20:00 - 5:00
23 - 27 Junefrom Monday evening to Friday morning
20:00 - 5:00
8 - 12 Septemberfrom Monday evening to Friday morning
20:00 - 5:00
15 - 19 Septemberfrom Monday evening to Friday morning
20:00 - 5:00
22 - 26 Septemberfrom Monday evening to Friday morning
20:00 - 5:00
29 September - 3 Octoberfrom Monday evening to Friday morning
20:00 - 5:00
6 - 8 Octoberfrom Monday evening to Wednesday morning
20:00 - 5:00
Passenger traffic will be redirected via the pass whenever possible, while heavy goods vehicles (>3.5 tons) will be stopped 30 minutes before the tunnel's closure at both the north and south entrances.
Every year, the Gotthard Tunnel is closed in March/April (1 week), June (2 weeks), and September/October (3-4 weeks) for 26 nights.
The nighttime closures are primarily aimed at carrying out work in the traffic space: cleaning tunnel walls, lighting systems, SOS niches, ventilation channels, and other facilities. Minor structural repairs are carried out where necessary, and maintenance work on operational and safety systems is also performed, during which the condition of these equipment is assessed.